Portfolio Limestone install around fireplace. Existing masonry chimney was removed. A new zero clearance gas fireplace installed, with marble installed around fireplace. Existing masonry chimney was re-built from roof line up, with a chase and metal pipes. The existing bricks were cut to make a thin veneer and installed over chase, matching existing look of old. The upstairs fireplace had a draft issue, that was solved during new construction. Also repairs had to be made to both fireplaces. Masonry chimney re-built from smoke chamber up. Decorative brick design added to top. Existing masonry chimney was broken at roof line, had no flue liner and damper. Also repairs were needed to fire box and smoke chamber areas. Masonry chimney was re-built from shoulder up, to required building codes, matching existing look of old. Masonry chimney re-built form smoke chamber up. Decorative brick design top added. Existing brick chimney, slid of the roof during an earthquake. Replaced brick chimney from attic floor up with a wooden chimney and metal liners. A thin brick veneer was installed over wood framing area above roof, matching existing look of old. Existing brick chimney was damage during an earthquake. Replaced brick chimney from the attic floor up, wth a wooden chase and metal liners. Stuccoed over chimney, matching stucco on house. Brick chimney re-built from attic floor up. Cultured stone added around fireplace. Damage chimney re-built form roof line up, re-using existing stones. Outdoor wood burning fireplace, with dry stack stone installed around fireplace. Damaged brick chimney was re-built from roof line up, with natural stone. Wood burning insert. Clinker brick chimney was re-built from smoke chamber up, re-using existing bricks. Installed a new fireplace, with gas logs and a new screen. A new wood burning zero clearance fireplace installed, with california gold flagstone installed around fireplace. Thin brick veneer, added over wood frame chimney. Removed existing brick chimney from attic floor up and installed a light weight metal pipe liner. Unreinforced brick chimney was replaced with a metal pipe liner from the attic floor up. Cultured stone was added over existing brick chimney top. Cultured stone was added over existing brick chimney top. Outdoor fireplace, BBQ and seating area, made out of river wash stone. Existing brick chimney was re-built from the roof line up. Existing brick chimney was broken at roofing line. Re-built chimney from smoke chamber up with a wooden chase and metal pipe. Stucco was added over chimney to match house and a wood burning insert installed. Existing masonry chimney was broken at roof line, had no flue liner and damper. Also repairs were needed to fire box and smoke chamber areas. Masonry chimney was re-built from shoulder up, to required building codes, matching existing look of old. Gas logs installed with on/off wall switch. No more spare the air days to worry about. Outdoor fireplace, BBQ and seating area, made out of river wash stone. A new wood burning zero clearance fireplace installed, with california gold flagstone installed around fireplace. Stone chimney, re-built from roof line up. Brick chimney re-built from shoulders up to required building code. Repairs were made to smoke chamber and firebox area. Gas line added to fireplace, for a log lighter. BBQ built, with connecticut blue flagstone. Outdoor wood burning fireplace, with dry stack stone installed around fireplace. BBQ built, with connecticut blue flagstone. Tile fireplace (for looks only, not a functional fireplace). Existing brick chimney was re-built from the roof line up. Existing brick fireplace and chimney was removed. A new zero clearance gas fireplace installed, with limestone installed around fireplace. Culture stone was added over existing brick chimney. A gas insert was installed into existing masonry fireplace and new tile work installed around fireplace. Gas line added to fireplace, wtih gas logs. No more spare the air days to worry about, no more ash to clean out of fire box and it can be turned on and off, by a flick of a switch Brick chimney re-built from roof line up. Culture stone added over existing brick fireplace, with a new wooden matel. Gas log set up with on/off wall switch. Brick repairs were made and a new metal top installed. New brick fireplace and insert. Chimney was pulling away from guest room. Repaired from top of smoke chamber up and re-pointed lower mortar joints. A top damper and spark arrestor was installed. Existing unreinforced chimney was re-built from roof line up and a gas insert installed. Thin brick veneer, added over wood frame chimney. Brick chimney re-built from attic floor up. 2013-05-06
Comments are closed, but trackbacks and pingbacks are open.